Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Cairn likely to complete last stretch of Mangala pipeline

Monday, 22 Oct 2012
Share this on :

Cairn India is likely to take up the last 80 km stretch of the 670 km Mangala Development Pipeline designed to evacuate the crude oil produced from Rajasthan.

At present, 590 km of the pipeline is operational - from Barmer field to Salaya which is delivering crude oil to IOC refineries (two) and private domestic refinery of Reliance Industries and Essar Oil. The current pipeline capacity is 1,75,000 bopd.
 
Meanwhile, Cairn is also planning de-bottlenecking the existing network which would add around 10 per cent additional capacity, with newer technology. 
 
New Password
Confirm Password