Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Pedder road flyover project may take off soon

Wednesday, 31 Oct 2012
Share this on :

Work on Pedder Road flyover project is likely to commence as the preliminary digging work is expected to commence in November 2012. 

The MSRDC project has received in-principal approval from the Mumbai traffic police. Formal approval for the project is expected to come soon. Initially, the MSRDC's technical team will dig pilling holes at 22 places along Pedder Road and collect soil samples. The piles will be dug at every kilometre of the stretch, on either side of the road. The work is expected to be completed by the second week of November 2012.
 
The proposed flyover, 4.1 km long, will start in front of Lala Lajpatrai College near Haji Ali and end at Tambe chowk, the intersection of Babulnath Road and Marine Drive. It will have 100 pillars, 32 less than in MSRDC's original plan.
 
The project has been opposed by the area's residents, including singers Lata Mangeshkar and Asha Bhosle.
 
Related Links:
Project profile
 
New Password
Confirm Password