Dilip Buildcon (DBL) through a joint venture HCC-DBL has been declared the lowest (L1) bidder for new BG line in Uttarakhand for a tender floated by Rail Vikas Nigam.
The scope of work envisages construction of tunnels, bridges, yard and formation works from chainage 117.365 to 125.320 under Package-9 in connection with new BG line between Rishikesh and Karanprayag in Uttarakhand. The length of the rail line is 7.955 km.
The cost of the project is Rs 1,334.95 with a completion period in 50 months.