NTPC has declared commercial operation of its Unit-2 of 800 MW Gadarwara Super Thermal Power Station (two x 800 MW) with effect from 1 March 2021.
With this, the commercial capacity of NTPC and NTPC Group will become 52,115 MW and 64,880 MW respectively.