NTPC has dispatched its first coal rake from NTPC Talaipalli Coal Mine to NTPC Lara Super Thermal Power Project in Chhattisgarh.
The MGR track length from Talaipalli to Lara is 65 km. The commencement of rake loading paves the way forward for Talaipalli Mine to dispatch coal in a smooth and eco-friendly manner to meet the coal requirements of 1,600 MW NTPC Lara.