Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Telangana govt moots thermal power project at Suryapet

Friday, 21 Feb 2020
Share this on :

A 300 MW thermal power project is proposed to be set up by Mecwel Power at Vellataru village of Chintalapalem mandal in Suryapet district, Telangana.

 

The project, which is conceived with two units of 150 MW each, is estimated at Rs 2,160 crore on 332 acre as per the detailed project report (DPR) which has been submitted to the state-level environment impact assessment authority, which in turn referred it to the Central government for environmental clearance (EC).

The power project will help in meeting the power demand in the state itself as the Telangana State Transmission Corporation will not be signing a power purchase agreement (PPA) for this.

The DPR envisages evacuation of power generated by the company to the Telangana Power Generation Corporation’s 220 kv substation at Pulichintala hydel dam project. The first unit will be commissioned in 27 months from the Notice to Proceed, and the second unit after an interval of three months.

The project is proposed to be executed by 12 engineering, procurement and construction (EPC) contracts. It was planned at a time when the capacity addition assumption was based on projected growth in power demand of six percent annually till 2022 in Telangana.

The annual coal consumption for the 300 MW power station is estimated at 2.01 million tpa with purchases both from the Singareni Collieries and international traders. A dedicated rail track will be laid up to the coal handling area of the plant from Mellacheruvu railway station when the coal was brought by rail from Singareni Collieries.

The cost of power generation per kWh at the station for the first year of commercial operation worked out to Rs 4.82 per kWh. The annual fixed operation and maintenance (O&M) cost was considered at Rs 3.20 crore per MW of generation based on 2017-18 as the first year of operation and escalated at the rate of six percent per annum as per the Central Electricity Regulatory Commission (CERC) norms.

 
Post Your Comments
 
 
   
 

 

 
  
Sign up to start your free trial

Are you...



REGISTER AND GET STARTER KIT ABSOLUTELY FREE!

Free access to Project News and Analysis

Project and Tender Alert in your mailbox

Explore the largest Database on Projects for free

Be part of Online Projects Community

Username:

Start Exploring

Subscribe to any of our premium plans to

Access to complete information on 43000+ projects

Use our Notification service for instant update on projects and tenders

Closely monitor your opportunities with "WORKSPACE"

Use our online platform for promotions of your products and services