Mumbai Metropolitan Region Development Authority (MMRDA) has extended the bids submission date for the BKC elevated connector project.
The last date for submission has been extended to 14 July, 2014.
The scope of work includes design and construction of the elevated connector between BKC ‘G’ block and Eastern Express Highway including construction of ROB on the V N Purav Marg at the level crossing near Chunabhatti Railway station.
Related Links