Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

HCC bags contracts including 10.2 km tunnel in Jammu & Kashmir

Tuesday, 11 Sep 2012
Share this on :

HCC has bagged two major contracts worth Rs 1,534 crore in various business segments including one in Jammu & Kashmir for construction of a tunnel.

The first contract worth Rs 884 crore is for the construction of a 10.2 km tunnel on the Udhampur-Srinagar-Baramulla railway line in Jammu & Kashmir. The project is to be completed in 60 months. The tunnel contract on the Dharam-Qazigund Section in the state has been given to HCC by IRCON International, which is engaged in constructing the Udhampur-Srinagar- Baramula railway line.

The second is an EPC contract worth Rs 650 crore is for expansion of a section of the National Highways-8 between Vadodara and Surat, which also includes the construction of an extradosed bridge across River Narmada. The contract is from HCC Concessions, a step down subsidiary of HCC. The scope of work also includes the construction of a new four-lane extradosed bridge across the Narmada River in Gujarat on a DBFOT (Toll) basis. Work has already commenced on this project, and is scheduled for completion in 36 months.

This contract was awarded to HCC Concessions by the NHAI in April 2012 for the six-laning of a section of NH-8 between Vadodara and Surat.
 

New Password
Confirm Password