Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Indian Railways' Phase I of DMU factory in West Bengal to be ready in November

Friday, 03 Feb 2012
Share this on :

The Phase I of the Indian Railways' DMU (diesel multiple unit) factory at Haldia in West Bengal is likely to be commissioned in November 2012.

The project is to be spread over 42.5 acre adjacent to the present Haldia railway station. Work on the Phase I had commenced in August 2011. The project is being implemented by Rail Vikas Nigam. The first phase is estimated to cost over Rs 110 crore. It will have a capacity to produce one rake consisting of eight coaches every month under the first phase while post completion of the Phase II, the factory will make a total of 50 rakes per annum. The Phase II estimated to cost Rs 179 crore, is to be implemented through the PPP mode.

Related Links:
Project profile

New Password
Confirm Password