Chennai Metro Rail Ltd (CMRL) is likely to invite bids in November 2009 from 
contractors for the supply of passenger cars. 
The scope of work covers design, manufacture, supply, testing and 
commissioning of the electric multiple units (EMUs) and the training of 
personnel on the operation and maintenance of the EMUs. CMRL expects to have 42 
train sets of four-car configuration, a total of 168 coaches. Each four-car 
train set will have two motor coaches and two trailer coaches with flexibility 
to convert to a 6-car rake. 
CMRL is implementing the 45-km Chennai metro project, consisting of two 
inter-connected lines linking North Chennai to the airport to the south and the 
Chennai Central to St Thomas Mount. The project entails an estimated investment 
of Rs 14,600 crore. Japan International Cooperation Agency is funding 60 per 
cent of the cost through a loan and the balance is shared by the State and the 
Union governments. 
Also See:
Work commences on Chennai metro (11-Jun-09)
Related Links:
Project profile