Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Koldam power project to complete in 2012

Monday, 10 May 2010
Share this on :

The 800 MW (4x200 MW) Koldam hydropower project being executed by the NTPC in Himachal Pradesh is expected to be completed by March 2012.

The hydropower project is located on the border of Bilaspur and Mandi districts and entails a cost of around Rs 4,527 crore. The project is being built on the pattern of a run-of-the river project on River Satluj as the silt is not allowed to accumulate and hinder the power generation process.

The project involves construction of a 163 mtrs high rock-fill dam across Satluj at slapper and surface powerhouse at the toe of the dam.

Related Links:
Project profile

New Password
Confirm Password