Sadbhav Engineering has emerged as the successful bidder for the Jodhpur-Barmer section of Rajasthan.
Bids for the project were floated by National Highways Authority of India (NHAI), Ministry of Road Transport and Highways (MoRTH).
The scope of work for the project involves widening and strengthening of Jodhpur-Barmer Section of NH-112 (Jodhpur to Pachpadra Package-I) with two lane with paved shoulder / four lane from 140.00 km to 225.615 km (length 85.615 ) under NHDP-IV, on EPC basis.
The construction period of the project is 910 days (2.5 years) from the appointed date. The maintenance period for the project is four years commencing from the date of the Provisional Certificate.
Related Link:
Project profile