Urban Improvement Trust (UIT), Kota invites RfQs for construction of Northern Kota bypass project in Rajasthan on EPC mode.
The RfQs from eligible firms have been invited for the following work:
|
-
Construction of Northern Kota bypass from design Ch 0.000 (Km 391/100 of NH-76) to design Ch 10+300 (Rangpur Road) Package-I to two lane with paved shoulders configuration. The work is estimated to cost around Rs 57 crore.
|
|
-
Construction of Northern Kota bypass from design Ch 10+300 (Rangpur Road) to design Ch 14+200 (Km 11/700 at SH-33 Kota-Lalsot Mega highway) with link road of 452 mtrs length and with SH-33 Package-II, to two lane with paved shoulders configuration. The work is estimated to cost around Rs 74 crore.
|
Related Link:
Tender
Project profile