Gujarat Industries Power Company (GIPCL) has invited bids for work related to setting up of upto 300 MW wind power project in Gujarat.
Bids have been invited for an engineering consultant for setting up of upto 300 MW wind power project in the state, on a turnkey basis.
The selected bidder will have flexibility to offer minimum 10 MW per bid and maximum upto 300 MW at one or multiple locations. The locations of the power plant will be offered by the bidder in Gujarat. The configuration of the plant is WTG of MW class with higher hub height and rotor diameter. Power evacuation consists of 220 kV / 132 kV / 66 kV GETCO network. Besides, power and water for the work will be supplied from nearby sources (by the EPC contractor). The governing policy for the wind power project is Wind Power Policy-2013 by Gujarat government, GERC order, GETCO or any other policy applicable to the project.