Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Sadbhav Engineering wins NHAI project

Friday, 27 Feb 2015
Share this on :
Sadbhav Engineering has emerged as the successful bidder for the bids invited by National Highways Authority of India (NHAI).

 

The scope of work for the company is for four-laning of Ambala-Kaithal section from km 50.860 to km 95.360 (length km 44.500) in the state of Haryana, of NH-65 with paved shoulder, under NHDP Phase-III, on EPC mode (Package-II).

 

The length of the project is 44.500 km while the project cost is Rs 459.00 crore. The construction period is 2.5 years while the maintenance period is four years.

 

More Project Info:
Road Upgradation (Ambala-Kaithal) Project

New Password
Confirm Password