Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work commences on East-West Metro project in Kolkata

Monday, 27 Feb 2012
Share this on :

Mamata Banerjee, Chief Minister of West Bengal,  inaugurated the tunneling work of East-West Metro Corridor project , Kolkata

The Rs 4,874 crore project will connect IT hub Sector V in Salt Lake to Howrah across the river Hooghly. This 14.58 km line will be constructed and maintained by Kolkata Metro Rail Corporation (KMRC). The Japan International Cooperation Association is funding the project with a long-term soft loan. The East-West Metro project will have 12 Metro stations, including one near the State Secretariat. In the Phase I, two tunnels for up and down lines will be dug from Subhas Sarobar to the existing Central station of the Kolkata Metro Railway and in the Phase II, a tunnel will be laid below the Hooghly up to Howrah. Two sophisticated boring machines brought from Germany will be used for tunneling. The project is expected to be completed by December 2014.

Related Links:
Project profile

New Password
Confirm Password