Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work on Andheri-Goregaon harbour line to commence by March end

Friday, 17 Mar 2017
Share this on :
Work on the Andheri-Goregaon harbour line is likely to begin by the end of March 2017.

Mumbai Railway Vikas Corporation (MRVC) and Western Railway will carry out the work on the project. As a result, slow trains will not halt at Jogeshwari station but the railway authorities are planning to halt all fast trains at this station.

The authorities are at the final stage of clearing the Rs 103 crore project.

Once completed, the project will provide a connectivity between Navi Mumbai and Goregaon. The proposed project is part of the Mumbai Urban Transport Project (MUTP)–I and will be extended till Borivali in the MUTP–II.

New Password
Confirm Password