Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Phase I of Rajkot BRTS on fast track

Saturday, 01 Aug 2009
Share this on :

Rajkot Municipal Corporation (RMC) has completed 27 per cent work on the Phase I of the Bus Rapid Transit System (BRTS) known as 'blue corridor'. The cost of Phase I is estimated to be around Rs 110 crore.

The whole project has been divided into three parts called blue, red and green corridors. The blue corridor surrounding Rajkot in Gujarat spans around 29 km.

At present, work is on, at the 150 ft ring road which connects Gondal road and Jamnagar road national highway. Three flyovers are being constructed on this 10.70 km stretch wherein 18 per cent work has been completed, according to sources. RMC expects to complete the Phase I by August 2010.

The BRTS project in Rajkot covers an area of 67 km. The other phases are to cover 9.16 km from Jamnagar road to Greenland cross road and 9.14 km road from Greenland cross road to Gondal road highway.

Work on the red and green corridors will begin after 2010 and these two projects are likely to be completed by 2012.

New Password
Confirm Password