Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Era Infra bags NTPC contract for Lara STTP

Friday, 12 Apr 2013
Share this on :

Era Infra Engineering (EIEL) an integrated infrastructure company has bagged a contract from NTPC for Lara super thermal power project (STTP).


EIEL has bagged an order worth Rs 429.69 crore for civil works of main plant and offsite civil works package for Lara super thermal power project, Stage-I (2x800 MW) in Raigarh district of Chhattisgarh. The scope also includes construction of one twin flue 275 M high RCC Chimney with steel liner.


NTPC is developing a 4,000 MW thermal power plant under two stages over 3,500 acre area. The stage-I of the project envisages development of (2x800 MW) while stage-II will have (3x800 MW) power units. The plant will be developed with super critical technology, wherein NTPC will supply 50 per cent of the power to the state government.

 

Related Link:
Project profile
 

New Password
Confirm Password