Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NUPPL’s Ghatampur thermal power project achieves milestone with COD for Unit-2

Tuesday, 09 Dec 2025
Share this on :

Neyveli Uttar Pradesh Power (NUPPL), a joint venture between NLC India and UPRVUNL has announced the successful commercial operation declaration (COD) of Unit-2 (660 MW) at the Ghatampur Thermal Power Project.

This milestone, effective from 09 December, 2025, brings the total capacity of the project to 1,320 MW, with Units-1 and 2 now fully operational. The Ghatampur project, located in Kanpur district, Uttar Pradesh, is a major coal-based thermal power plant with a total planned capacity of 1,980 MW across three supercritical units of 660 MW each.

With Unit-2 now in operation, the third and final unit is expected to be completed within the 2025-26 financial year, ensuring a significant boost in reliable and sustainable power supply to Uttar Pradesh and Assam.

New Password
Confirm Password