Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

BGR emerges lowest bidder for 660 MW NTPC boiler contract

Thursday, 01 Mar 2012
Share this on :

BGR Energy Systems has emerged as the lowest bidder for the NTPC 11 x 660 MW supercritical boiler tender.

The tender is for supply of 660 MW supercritical boiler for Mouda super thermal power project, Stage-II (2 x 660 MW); Solapur super thermal power project (2 x 660 MW); Nabinagar super thermal power project (3 x 660 MW); Meja thermal power project (2 x 660 MW) and; Raghunathpur thermal power project, Phase-II (2 x 660 MW).

BGR Energy has emerged as the lowest bidder in all five projects. As per tender conditions of NTPC, BGR Energy will be awarded contract for seven boilers. The aggregate value of contract is about Rs 6,500 crore. These contracts are to be executed in 48 months. These boilers will be manufactured by BGR Boilers, a JV between BGR and Hitachi Power Europe.

New Password
Confirm Password