Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Phase-I of Safdarjung Railway project to be completed by 2019

Friday, 04 Aug 2017
Share this on :

The first phase of redevelopment of Safdarjung railway station is expected to be completed by January 2019.

 

The Indian Railway Construction Company (IRCON) will carry out design, construction and marketing of the project. Phase-I of the project will come up on the Moti Bagh side of the station.

The Indian Railway Construction Company (IRCON) and the Rail Land Development Authority (RLDA) have signed a memorandum of understanding (MoU) to implement the project.

The station is proposed to be developed on a self-financing model for which finance will be raised through marketing of the commercial built-up area which will be developed on the surplus railway land and air space as part of the station development project.

The land and the constructed buildings will continue to remain under the ownership and control of the RLDA. The commercial built-up area will be leased for upto 45 years by RLDA.

New Password
Confirm Password