eGateway India, on behalf of Sahara India Power Corporation (SIPCL), has invited bids for coal-based power unit at Titlagarh in Bolangir district of Orissa.
Bids have been invited for design, engineering, manufacturing, procurement, supply, transportation to site, handling, storage, erection, installation, testing, commissioning, performance testing, training of owners' personnel, and final completion of 1320 MW (2x660 MW) super critical thermal power generation station including supply of mandatory / recommended spares, commissioning spares, and special tools and tackles on EPC basis.
Completion period of the work from date of notice to period (NTP) is 42 months for the first unit and 48 months for the second unit.