Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Boiler light up achieved for Sasan UMPP Unit-V

Tuesday, 15 Jul 2014
Share this on :
Reliance Power’s wholly owned subsidiary, Sasan Power, has achieved boiler light up for its Unit-V of Sasan Ultra Mega Power Project (UMPP) located in Sidhi district of Madhya Pradesh.


The coal-based power project has a total capacity of 3,960 MW (6 x 660 MW). The total capacity of the Sasan Power project as of now is 3,300 MW.


The first four 660 MW units of the project are already operational and the sixth unit of the project is in an advanced stage of construction and is expected to be commissioned in the next few months.


Coal production has already begun from the 20 million tpa capacity of the Moher-Amlohri coal mines.

Related Link:
Project Profile

New Password
Confirm Password