Mumbai Metropolitan Region Development Authority (MMRDA) has decided to build a rail-over-bridge (ROB) at the level crossing at Chunabhatti.
The 1.6 km ROB project is estimated to cost Rs 165 crore and will include two elevated connectors joining Bandra-Kurla-Complex to the Eastern Express Highway. Project work will be completed in the next six months.
This ROB is projected to improve the harbour line’s punctuality during the peak hours. MMRDA’s decision to construct this bridge was taken as the Central Railway wants to shut down the level crossing.