Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GMR Infra to develop Hyderabad-Vijayawada highway

Thursday, 28 May 2009
Share this on :

GMR Infrastructure has bagged the Rs 1,750 crore Hyderabad-Vijayawada four-lane highway project on BOT basis.

The highway measuring 181 kms on NH-9 entails designing, engineering, finance, procurement, construction, operation and maintenance of the project.

The company was one of the five bidders for the highway project, which was caught in controversy after several rounds of litigation in the Delhi high court and the Supreme Court over who would be allowed to place bids for the project.

GMR has agreed to share 31 per cent of the revenue in the first year with an annual increment of one percentage point for the duration of concession period of 25 years.

Also See:

GMR Group's Adloor Yellareddy-Gundla Pochanpalli highway opens for traffic (01-Apr-09)

Related Links:
Project profile

New Password
Confirm Password