Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

LLC Volgadorstroy emerges as L1-bidder for Ujjain-Jaora greenfield highway project

Monday, 13 Oct 2025
Share this on :

LLC Volgadorstroy has emerged as the lowest bidder (L1) for the development of the Ujjain-Jaora access controlled greenfield highway, including the Ujjain spur connectivity.

The contract involves constructing a four-lane highway with paved shoulders, spanning a design length of 98.73 km in Madhya Pradesh. Issued by the Madhya Pradesh Road Development Corporation, this significant infrastructure work with an estimated value of Rs 2,080 crore will be executed under the hybrid annuity mode (HAM). The completion timeline is 60 months. 

The highway aims to improve connectivity and support regional growth by facilitating smoother and faster transportation. The project is expected to enhance economic activities in the region and contribute to the state’s road infrastructure development, strengthening linkages between key cities and boosting overall mobility.

New Password
Confirm Password