Madhya Pradesh Road Development Corporation (MPRDC) has floated a tender for the development of an access-controlled greenfield highway connecting Ujjain and Jaora in Madhya Pradesh The scope of work includes a dedicated spur connectivity to Ujjain.
The highway will be developed as a four-lane carriageway with paved shoulders and executed under the hybrid annuity model (HAM). The contract has a design length of 98.73 km and is estimated to cost approx. Rs 2,418.47 crore. The selected concessionaire will be given a construction period of 24 months to execute the work.
The last date of submission of bid is 24 Jul,y 2025, while the technical bids are scheduled to be opened on 25 July, 2025.