Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Barh thermal power plant in a limbo

Tuesday, 19 Aug 2008
Share this on :

NTPC's Barh super-thermal power project in Patna district of Bihar is in a limbo and is unlikely to start power generation by 2011.

The Union ministry of power has set up a committee to look into the irregularities in awarding the contract for purchasing boiler for this plant. A Russia-based company has asked the Indian government to sign a fresh contract order at an enhanced rate due to the cost escalation.

It is also learnt that, NTPC had signed a contract on fixed value-price. Due to delay in the project, the cost of boiler and its equipment have shot up. So the matter is pending before the Centre, which will be expedited only after obtaining the report of the expert committee.

New Password
Confirm Password