Delhi Metro Rail Corporation (DMRC) has invited bids for the design and construction of Yuge Yugeen Bharat underground station under Phase-V(A) of Delhi MRTS.
The scope of work includes design and construction of structure of underground station along with PD area and associated entry/ exit structures, subways, and structures such as ancillary building, utilities galleries, AC plant room, ASS room, shafts, pump houses, water tanks, diesel generator set room or enclosure, sumps as per GAD and tender drawings.
The estimated value of work is Rs 206.32 crore, and is scheduled to be completed within 21 months. The last date for the submission of bids is 07 July, 2025.