Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Dineshchandra R Agrawal Infracon declared L1-bidder for BOP package at Ukai TPS

Friday, 10 Jan 2025
Share this on :

Dineshchandra R. Agrawal Infracon has been declared the lowest bidder (L1) for the execution of balance of plant (BOP) packages for the 1x800 MW ultra super critical unit no. 7 in Gujarat.

 This unit will be constructed on the ash dyke area at Ukai Thermal Power Station (TPS), operated by Gujarat State Electricity Corporation (GSECL). The company emerged as the lowest (L1) bidder for the engineering, procurement, and construction (EPC) order with a bid value of Rs. 4,461.01 crore.

Once operational, the unit is expected to significantly contribute to the state’s power supply through advanced ultra-supercritical technology, ensuring improved efficiency and reduced emissions. The development represents a major milestone in strengthening Gujarat's energy infrastructure. 

New Password
Confirm Password