Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Foundation stone laid for NTPC's Gadarwara plant

Thursday, 20 Feb 2014
Share this on :

On 19 February 2014, Jyotiraditya Scindia, Power Minister, laid the foundation stone for Phase-I of NTPC's coal-based power plant at Gadarwara, in Narsimhapur district of Madhya Pradesh.


The power plant, estimated to cost Rs 11,640 crore, will be developed by the company in two phases. Phase-I and II of the project will each have a capacity of 800 MW. The company will source coal for this project from the Talaipalli block in Mand-Raigarh coalfields.


Besides, NTPC is planning to set up two more power projects in the state. One of these projects will be set up at Khargone and the other will come up at Barethi.


 

New Password
Confirm Password