Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GMR Smart Electricity secures work order worth Rs 5,123 cr

Monday, 04 Sep 2023
Share this on :

GMR Smart Electricity Distribution (GSEDPL) has received a letter of award (LoA) from Purvanchal Vidyut Vitran Nigam (PUVVNL) to implement a smart metering project in the Purvanchal area of Uttar Pradesh, including Varanasi, Azamgarh, Prayagraj and Mirzapur.

GSEDPL, a step-down subsidiary of GMR Power and Urban Infra (GPUIL), will be responsible for supplying, installing, integrating and maintaining 5.017 million smart meters in these areas on design, build, finance, own, operate, transfer (DBFOOT) basis. The contract is to be executed within 27 months from the commencement date, and the operational period will run for 93 months.

The estimated cost to carry out the work in the Prayagraj and Mirzapur Zone is Rs 2,386.72 crore and Varanasi and Azamgarh Zone is expected to cost around Rs 2,736.65 crore. 

Moreover, this advanced metering infrastructure (AMI) project will be executed under the revamped distribution sector scheme (RDSS). The project seeks to reduce AT&C losses in the designated area and improve the operational and collection efficiency of distribution companies in the state.

New Password
Confirm Password