Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Gujarat Water Infrastructure floats tenders for works of Dhanki to Tokrala Bulk Pipeline

Monday, 29 Nov 2021
Share this on :
Gujarat Water Infrastructure has invited bids for works of design and construction of Dhanki to Tokrala Bulk Pipeline in two separate packages. 
 
The scope of work includes design and construction of Dhanki to Tokrala (upto national highway crossing) Bulk Pipeline 45 km including construction of RCC U/G sump, pump house, SITC of pumping machinery and ancillary works with 10 years comprehensive operation and maintenance under Dhanki to Navda Bulk Pipeline Project at Dhanki pumping station (Package-I, NC-42). The value of the work is Rs 447.82 crore.  
 
Another tender is for works of design and construction of Tokrala (from NH) to Navda Bulk Pipeline 54 km including ancillary works with 10 years comprehensive operation and maintenance under Dhanki to Navda Bulk Pipeline Project at Navda pumping station  in Ahmedabad district of Gujarat (Package-2, NC-43). The value of the work is Rs 468.78 crore. 
 
The completion period for both the works is 18 months.
New Password
Confirm Password