The second unit of 660 MW Khargone Super Thermal Power project in Madhya Pradesh has been added to the installed capacity of NTPC on completion of trial operation.
With this, the total installed capacity of Khargone Super Thermal Power project is 1,320 MW, NTPC is 5,0355 MW and NTPC Group is 58,816 MW.