NTPC has successfully completed trial operation of Unit-2 of 660 MW capacity of Tanda Super Thermal Power Station, Stage-II.
With this, the Unit-2 has been included in the installed capacity of NTPC Group with effect from 31 March 2021.
With this, the total installed capacity of NTPC and NTPC Group has become 52,385 MW and 65,810 MW respectively.