Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Tender floated for doubling project on Baikunthpur -Surajpur station route

Monday, 12 Jun 2023
Share this on :

The South East Central Railway has floated a tender for the doubling work on Baikunthpur road station to Surajpur station route in Chhattisgarh.

The doubling work will cover the section commencing from Baikunthpur road station (end ch 967.055) to Surajpur road station (end ch: 1006.44) (39.385 km) beside the existing single BG line in Chhattisgarh.

The cost of the project is Rs 485.78 crore, along with a completion period of 24 months.

The closing date for bid submission is 06 September, 2023.

New Password
Confirm Password