Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work begins on Moser Baer's plant in Madhya Pradesh

Monday, 05 Apr 2010
Share this on :

The pre-execution activities have been put on fast tack by Moser Baer Power & Infrastructures 1,200 MW thermal power project in Madhya Pradesh, in order to commence construction work.

The company has acquired 996 acre spread across the villages of Murra, Guwari, Belia and Jaithari, needed for construction of the project units as well as for the development of the green-belt.

The coal requirement for the plant has been estimated at 6.6 million tpa. The company has already tied up with South Eastern Coalfields to meet the feedstock requirements of this project. The plant is likely to be commissioned within 36 months from the date of award of contract for the main plant equipment.

 

New Password
Confirm Password