Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Bhilwara Energy plans four hydel projects

Monday, 29 Mar 2010
Share this on :

Bhilwara Energy has chalked out a Rs 10,000-crore investment plan to set up four hydel power projects with a total generation capacity of around 1,200 MW in the next three to four years.

The company is mulling to raise up to Rs 3,000 crore through various routes, including hitting the capital market, to part finance the projects.

The company proposes to set up four projects - two in Nepal, one each in Punjab and Arunachal Pradesh. Of the four, the plant in Punjab is to have a capacity of 85 MW. The one in Arunachal will generate 900 MW, while the two in Nepal will have a total capacity of 170 MW.

 

New Password
Confirm Password