Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Essar refinery by end-November 2006

Friday, 10 Nov 2006
Share this on :

Essar Oil is scheduled to commission its 10.5 million tpa Vadinar refinery by end-November 2006. The refinery will start operating at 7.5 million tpa while full capacity will be attained by March 2007. Three consignments of crude (totaling 3 million barrels) are already lying in Essar Oil's tank farm.

The refinery project, first proposed in 1995, has suffered inordinate delays. Work on the refinery was stopped in January 2002 only to revive in March 2005.

Recursive Links:

First crude consignment for Essar refinery arrives (23-Sep-06)

New Password
Confirm Password