Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

G R Infraprojects emerges as L1 bidder for passenger ropeway at Katra, J&K

Monday, 13 Nov 2023
Share this on :

G R Infraprojects has emerged as lowest bidder (L1) to construct a passenger ropeway between Tarakote and Sanjichhat at Katra, Jammu & Kashmir. On 09 November, 2023, a financial bidding was opened for the tender invited by RITES on behalf of Shri Mata Vaishno Devi Shrine Board (SMVDSB).

The work entails designing, engineering, construction, finance, operation and maintenance (O&M) of passenger ropeway between at Katra. The project, amounting to Rs 200 crore, is to be executed under build-own-operate-transfer (BOOT) mode.

The concession period for the project is 33 years, including a three year construction period.

G R Infraprojects is engaged in EPC and project management services for roads & highways, bridges, airport runway, railways, metros, power transmission and tunnelling.

 

New Password
Confirm Password