Larsen & Toubro (L&T) Hydrocarbon Engineering has won a mega order from Sonatrach-AIgeria.
The engineering, procurement, construction and commissioning (EPCC) contract is to set up three central processing (CPF) facilities at -- six MMSCMD capacity facility at Hassi Ba Hamou and Reg Mouaded Field, four MMSCMD at Hassi Tidjerane Field and four MMSCMD capacity facility at Tinerkouk Field.
The three facilities are located close to each other in the Adrar province of Algeria. Process facilities include separation, compression system, mercury removal, gas dehydration, hydrocarbon dew point control and associated off-site utilities.
The project maximises modularisation which reduces site construction works and achieves standardisation across the fields. All modules will be fabricated in-house at Larsen & Toubro's manufacturing facilities. The contract has been awarded through international competitive bidding on a lump sum turnkey (LSTK) basis.