Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

L&T's power business wins order from NTPC

Monday, 26 Aug 2019
Share this on :
The power business of Larsen & Toubro (L&T) has bagged engineering, procurement and construction (EPC) order from NTPC.

The order has been bagged for setting up Flue Gas Desulphurisation (FGD) system at Vindhyachal Super Thermal Power Station, Stage-I & II (6 x 210 MW and 2 x 500 MW), in Madhya Pradesh. This is in continuation to the order received for Stage-III & IV (2 x 500 MW & 2 x 500 MW) in September 2018.

With this, L&T will be implementing FGD systems for 12 units constituting 4,260 MW at NTPC's Vindhyachal power plant which will have the maximum number of FGD systems at one location in India.

New Password
Confirm Password