Oil & Natural Gas Corporation (ONGC) has issued a tender for the replacement of 24-inch crude oil transfer pipelines connecting its Trombay terminal to Bharat Petroleum Corporation (BPCL) and Hindustan Petroleum Corporation (HPCL) refineries in Uran.
The project involves engineering, supply, installation, testing, and commissioning of the new pipeline system to ensure uninterrupted and safe crude oil transfer from ONGC’s Trombay terminal to the Uran refinery plants. The scope emphasises adherence to safety, environmental, and operational standards relevant to crude oil pipelines. The completion timeline is 18 months from the date of issuance of notice of award (NoA).
Interested contractors are required to submit bids by 14 November,2025.