Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

SJVN, GMR signs MoU Upper Karnali hydro project in Nepal

Tuesday, 10 Sep 2024
Share this on :

SJVN, GMR Upper Karnali Hydro Power (GMR) and Indian Renewable Energy Development Agency (IREDA) have signed a memorandum of understanding (MoU) for the development of Upper Karnali Hydro Electric Project of 900 MW capacity, through a joint venture (JV) company in Nepal.

The company and GMR will hold 34 percent shareholding each, while IREDA will have five percent shareholding in the proposed JV. The balance equity will be held by Nepal Electricity Authority (NEA).

The project is to be developed on a build, own, operate and transfer (BOOT) basis with 25 years concession period, post commissioning. The estimated project cost will be Rs 9,100 crore. 

New Password
Confirm Password