Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

SJVN to develop hydro power project Arun-4 in Nepal

Wednesday, 18 May 2022
Share this on :
SJVN will develop hydro power project Arun-4 worth Rs 4,900 crore in Nepal. 
 
A memorandum of understanding (MoU) for development of 490 MW hydro electric project in Nepal has been signed in Lumbini, Nepal. 
 
This will be the third mega project to be constructed by the company in Nepal. The construction of 900 MW Arun-3 project is in progress, while 669 MW Lower Arun project is at the survey and investigation stage. 
 
SJVN is targeting to have 5,000 MW projects in Nepal by 2030. The Arun-4 hydro electric project will be developed as a joint venture by SJVN and NEA, wherein the former will have majority stake. 
 
The project will generate around 2,100 million units of energy per annum.
New Password
Confirm Password