Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Tenders floated for Multi-Storey Bengaluru Housing Programme

Thursday, 06 Dec 2018
Share this on :
Rajiv Gandhi Rural Housing Corporation has floated tenders for diverse works under one lakh Multi-Storey Bengaluru Housing Programme.

The scope of work involves construction of multi-storeyed residential housing including infrastructures like layout electrification, water supply and sanitation, arboriculture, roads, drains, culverts, solar lighting, rain water harvesting re-charge pits, lifts with DG back-up, boundary compound wall with entrance gate, guard room, motor room, control room for electrical, water supply and electrical etc. including two years maintenance on DBOT basis.

The above works will be taken up in three Lots. The Lot-1 will entail an investment of Rs 1,280.89 crore, Lot-2 at a cost of Rs 901.48 crore, Lot-3 will cost Rs 1,722.09 crore. Each lot will be taken up in three different packages. The timeframe for completion of all three lots is 27 months.

New Password
Confirm Password