Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Adani Energy Solutions acquires Rs 12,000-cr HVDC transmission project in Gujarat

Monday, 15 Dec 2025
Share this on :

Adani Energy Solutions (AESL) has successfully acquired its second interstate transmission system (ISTS) project involving HVDC technology, under the tariff-based competitive bidding (TBCB) process.

The project, titled “Transmission System for Evacuation of Power from the Potential Renewable Energy Zone in Khavda, Gujarat under Phase-V (8GW): Part C,” is estimated to cost Rs 12,000 crore. AESL officially acquired the project special purpose vehicle (SPV), KPS III HVDC Transmission, from PFC Consulting on 12 December, 2025. This project is AESL's second ISTS acquisition, following its earlier acquisition of “Rajasthan Part I Power Transmission" in January 2025.

KPS III is also the third HVDC technology-based ISTS-TBCB project, with the first awarded to Power Grid Corporation of India (PGCIL) in November 2024. The KPS III project involves two ±500 kV HVDC terminals in Gujarat, connected by a 600 km link with a transfer capacity of 2,500 MW. "AESL emerged as the L1 bidder for this significant project," a source revealed.

New Password
Confirm Password