Airfloa Rail Technology has secured a new order from the Integral Coach Factory (ICF) in Chennai, Tamil Nadu, for the supply of various components to Indian Railways.
The order, includes the supply of a modified wider AC duct with a zigzag baffle plate for VB coaches, as well as additional equipment for one 16-car rake set. The company is expected to deliver the entire order within 90 days from the date of the purchase order, although ICF reserves the right to modify the delivery period based on production needs or urgency. The order also outlines several general conditions regarding delivery, inspection, warranty, payment terms, and other logistical aspects.
Airfloa Rail Technology is required to commence work immediately, with completion expected within the stipulated 90-day period. This new order strengthens the company’s position in the rail technology sector.