Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Alpex Solar expands cell plant in Uttar Pradesh to 2.2 GW

Friday, 31 Oct 2025
Share this on :

Alpex Solar has announced an upgrade to its proposed solar cell facility in Kosi Kotwan, Uttar Pradesh, increasing the capacity from 1.6 GW to 2.2 GW.

The transition will incorporate advanced G12R tunnel oxide passivated contact (TOPCon) technology, with a total capital expenditure (capex) of Rs 31.36 billion, funded entirely through internal accruals. The project will be completed in two phases: the first phase will establish 1.4 GW of G12R TOPCon capacity, with trial production slated for Q1 of 2026–27.

The second phase will add an additional 800 MW, expected to be completed within six months of the first phase. The entire 2.2 GW facility is projected to become operational in 2026–27, further solidifying Alpex Solar's position in the renewable energy sector.

New Password
Confirm Password